<?xml version="1.0" encoding="UTF-8"?>
<dataroot xmlns:od="urn:schemas-microsoft-com:officedata">
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Distribution Inc.</Historical_Company_Name>
<Year>2015</Year>
<Project_1_Project_Name>York Mills City of Toronto Culvert Relocation</Project_1_Project_Name>
<Project_1_Location>Toronto</Project_1_Location>
<Proj1_Date_Completed>7/10/2015</Proj1_Date_Completed>
<Project_1_Significant_Features>The City of Toronto replaced a culvert that is over top of our pipeline This new box culvert conveys a tributary of the Don River - Deerlick Creek. Toronto Ravine and Natural Feature Protection Area.</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Erosion and sediment control (ESC) around Enbridge (EGD) construction area. Worked within the in-water construction time frame. Tree inventory.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Construction through a watercourse and a Ravine and Natural Feature Protection area. Construction restraints for the Pan Am games.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>No outstanding concerns. Restoration was to be completed by the city.</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>EGD worked in conjunction with the city for ESC measures around a watercourse. ESC was installed around EGD construction site. Retained an arborist to assess the trees in the ravine area and determined no harm to trees was expected. Additional pipe was installed to remediate the depth issues of the orginal main.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>No</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>Toronto and Region Conservation Authority Permit, Municipal Permits, No Tree Permits Nescessary, Arborist Report.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>87622</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>87172</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>450</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>1</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Tie-in work was larger than expected</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>N/A</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>N/A</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>No</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Distribution Inc.</Historical_Company_Name>
<Year>2016</Year>
<Project_1_Project_Name>40.11409379.15 - 2097 Heritage Line, Peterborough</Project_1_Project_Name>
<Project_1_Location>Heritage Line, Peter</Project_1_Location>
<Proj1_Date_Completed>11/28/2016</Proj1_Date_Completed>
<Project_1_Significant_Features>Two fill regulated areas.</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Two fill regulated areas were identified; pipe installed by horizontal directional drill within these fill regulated areas, erosion and sediment control measures applied</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>N/A</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>N/A</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>N/A</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None.</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>All permits and approvals obtained: City of Peterborough Municipal Permit, Otonabee Region Conservation Authority</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>103036</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>173408</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>-70372</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>-41</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Contingency not used, job completion more efficien</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>N/A</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>N/A</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Distribution Inc.</Historical_Company_Name>
<Year>2017</Year>
<Project_1_Project_Name>10.12706782.17 2585 JANE ST HEADER REPLACEMENT</Project_1_Project_Name>
<Project_1_Location>2585 Jane Street, No</Project_1_Location>
<Proj1_Date_Completed>11/22/2017</Proj1_Date_Completed>
<Project_1_Significant_Features>1.Conservation Authority Fill Regulated Area surrounding an adjacent watercourse. 2. Work area identified to be within a Ravine and Natural Feature Protection (RNFP) Zone. 3. Species at Risk (SAR) concerns identified - Trees identified in proximity to the wok area that qualified as potential SAR bat/bird maternity roosting habitat.</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>SAR mitigation plans were produced but not implemented, as construction work was completed outside of the active bat/bird maternity roosting period. Erosion and Sediment Controls (ESC) were implemented to permit specifications to protect the adjacent watercourse.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>None.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>N/A</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>N/A</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None.</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>Conservation Authority Permit Obtained. Appropriate SAR Screening protocol was conducted, and mitigation plans were produced.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>271976</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>491481</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>219505</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>-45</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Project was completed faster than anticipated. Co</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>N/A</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>N/A</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>Variance Explanation: Project was completed faster than anticipated. Construction was able to optimize use of directional drill resulting in reduced project costs.</Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Distribution Inc.</Historical_Company_Name>
<Year>2018</Year>
<Project_1_Project_Name>20009039 &amp; 20278826</Project_1_Project_Name>
<Project_1_Location>Area 40 (Bowmanville</Project_1_Location>
<Proj1_Date_Completed>10/3/2018</Proj1_Date_Completed>
<Project_1_Significant_Features>The project consisted of the installation of the gas service to serve a new subdivision. The project crossed a watercourse that was in a fill regulated area for Central Lakes Ontario Conservation Authority. The subdivision development also identified Bobolink Species at Risk habitat in the area.</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>The pipeline was installed via a horizontal directional drill to avoid impacting the watercourse. Erosion and sediment controls were put in place including sediment soxx. The Town of Clarington provided the registration letter for the Bobolink SAR habitat.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Town of Clarington identified an impact to Species at Risk habitat (bobolink) as part of the subdivision development and gas service installation.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>No outstanding concerns</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>The Town registered the activity with the MNRF and provided the confirmation of registartaion to Enbridge.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>No post-construction issues.</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>CLOCA permit received 26 July 2018. MNRF Registration received 04/05/2018</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>450847</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>465176</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>-14329</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>-0.03</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>No variance in cost. Forecasted cost was in range</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>N/A</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>N/A</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>There was no other alternative route available to feed gas to the subdivision. </Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Inc.</Historical_Company_Name>
<Year>2019</Year>
<Project_1_Project_Name>Rockland Reinforcement - 20013608</Project_1_Project_Name>
<Project_1_Location>Cnty Rd 17, Rockland</Project_1_Location>
<Proj1_Date_Completed>12/18/2018</Proj1_Date_Completed>
<Project_1_Significant_Features>Potential for Species at Risk Watercourse Crossings Wetlands in vicinity of pipeline route Woodlots in vicinity of pipeline route Agricultural land adjacent to pipeline route Cemetery adjacent to pipeline route</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Species at Risk Completed Species at Risk review of area 1. Site restoration 2. No tree removal 3. Work will be limited to the road allowance 4. No in-water works; watercourse crossing will be completed via HDD 5. Installation of erosion sediment controls around tie-in pits Additional measures: 1. If any SAR are observed within the vicinity during construction, notify Land Services immediately. Watercourse crossings - cross above existing culverts using horizontal directional drilling techniques (HDD). Installation and maintenance of erosion and sediment control measures. Wetlands in vicinity of pipeline route - crossed within existing right-of-way utilizing HDD. Installation and maintenance of erosion and sediment control measures. Woodlots in vicinity of pipeline route - SAR review was conducted. No butternuts within the construction area. No tree removal. Agricultural land - Crossed the site using HDD to maintain access and reduce impact to the surface. Cemetery - A change was made pre-construction to keep the proposed gas main over 10m away from the cemetery. The route was adjusted since the preferred side street was not wide enough to allow the proposed gas main to be installed outside of a 10m buffer.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>The County of Prescott Russell had concerns with our gas main location through right-of-way in proximity to the wetland. No concerns identified during construction.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>No outstanding concerns.</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Talks progressed with that County and the concerns were resolved during the planning stage.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>All approvals and permits obtained and saved in project files.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>1928225</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>1812073</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>116152</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>6</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Route change to accommodate cemetery</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>n/a</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>Woodlot, agriculture, watercourse</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>cemetery</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>n/a</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>No</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>n/a</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>former landfill, woodlot, agriculture, watercourse</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>n/a</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>n/a</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>direct cemetery boundary impact</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>n/a</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>Not all project costs were invoiced by end of 2018, therefore, this project has been considered for 2019 reporting. Variance Explanation Additional Details: Shortly before the reinforcement went to Construction, a change in the proposed route was decided upon and permitted. This route change was slightly more complicated to construct and lengthened the proposed pipeline by approximately 80m but increased the separation from a cemetery. Environmental costs included in overall project costs.</Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Inc.</Historical_Company_Name>
<Year>2020</Year>
<Project_1_Project_Name>Phase 2 Oro-Medonte Reinforcement - 24069326</Project_1_Project_Name>
<Project_1_Location>Area 50</Project_1_Location>
<Proj1_Date_Completed>11/11/2020</Proj1_Date_Completed>
<Project_1_Significant_Features>Three (3) watercourse crossings (Lake Simcoe Region Conservation Authority [LSRCA]) Species at Risk (SAR) and SAR habitat Work was within municipally owned right-of-way Woodlots, trees and agricultural areas were identified in vicinity of the Project.</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Construction method for entire Project was Horizontal Direction Drill (HDD) method. Placing pipeline within previously disturbed municipally-owned right-of-way. Erosion/sediment controls installed and maintained within fill-regulated areas, as per LSRCA permits and drawings. SAR specific mitigation including, but not limited to: - HDD - turtle and turtle nest sweeps between April 1 and September 30th - bird nest sweeps, if vegetation clearing required, between April 1 and August 31 - SAR identification sheets provided and reviewed </Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>No</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>N/A</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>N/A</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>No</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>All permits provided and saved to files.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>1110340</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>1745488</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>-635148</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>-36</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Changes to scope, soil conditions and contingency</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>Yes</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>6</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>1</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>No</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>No</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>6</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>more due to easements, contaminated soils</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>2</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>Costs of environmental mitigation are included in total project costs (which are reported below).</Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Inc.</Historical_Company_Name>
<Year>2021</Year>
<Project_1_Project_Name>Daley Ditch Road Reinforcement Project# 20018195</Project_1_Project_Name>
<Project_1_Location>Southeast Region</Project_1_Location>
<Proj1_Date_Completed>7/23/2021</Proj1_Date_Completed>
<Project_1_Significant_Features>- Work within a fill-regulated area - Watercourse crossings - Work in vicinity of woodlots and agricultural land (potential Species at Risk habitat)</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>- Niagara Peninsula Conservation Authority (NPCA) permit, including environmental notes to be implemented in the field during construction - Horizontal Directional Drilling (HDD) - Installation of erosion and sediment controls - No tree removal - Species at Risk identification sheets - If vegetation clearing is required during the migratory bird nesting season (April 1 - August 31) conduct nest sweeps prior to construction - Environmental consultant retained to develop additional site-specific mitigation measures to prevent impacts to Species at Risk</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Yes - Provincially Significant Wetland identified by NPCA. NPCA requested additional mitigation plan for potential Species at Risk.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>N/A</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Retained Environmental Consultant to complete Species at Risk report, outlining additional mitigation measures to be implemented.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>No</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>All approvals saved in project files/Maximo</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>1303526</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>1316522</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>-12996</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>-1</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Project came in slightly under forecast.</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>N/A</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>N/A</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>N/A</Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Inc.</Historical_Company_Name>
<Year>2022</Year>
<Project_1_Project_Name>Wiarton System Reinforcement</Project_1_Project_Name>
<Project_1_Location>Wiarton</Project_1_Location>
<Proj1_Date_Completed>3/2/2022</Proj1_Date_Completed>
<Project_1_Significant_Features>Fill-regulated area Watercourse Crossing</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Horizontal Directional Drill (HDD) HDD Contingency Plan in place Erosion and sediment control measures Conditions as per conservation authority permit</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>None</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>n/a</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>n/a</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>All required permits and approvals obtained and saved in project folder</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>161051</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>164699</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>-3648</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>-2</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Actual material costs less than estimated cost.</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>n/a</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>n/a</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>n/a</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>n/a</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>n/a</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>n/a</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>n/a</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>n/a</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>n/a</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>n/a</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>n/a</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>n/a</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>No other alternatives considered, project scope involved connecting (2) existing dead end pipelines together to reinforce existing Wiarton Distribution System. </Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Inc.</Historical_Company_Name>
<Year>2023</Year>
<Project_1_Project_Name>30 Thornheights Road</Project_1_Project_Name>
<Project_1_Location>30 Thornheights Road</Project_1_Location>
<Proj1_Date_Completed>9/13/2023</Proj1_Date_Completed>
<Project_1_Significant_Features>Work within a fill regulated area - Toronto Region Conservation Authority (TRCA) Potential for species at risk</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Toronto Region Conservation Authority (TRCA) permit and associated conditions. Construction completed by Horizontal Directional Drill (HDD) through TRCA fill-regulated area. Utilized erosion and sediment control measures for HDD installation. Species-at-Risk Record prepared and included the following mitigation measures (non-inclusive list): erosion &amp; sediment control.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>None</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>Not applicable</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Not applicable</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>Not applicable</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>All required permits and approvals obtained and saved in project folder.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>-9937</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>17590</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>7653</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>44</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>See information in comments above.</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>Not applicable</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>Not applicable</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>Not applicable</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>Not applicable</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>Not applicable</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>Not applicable</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>Not applicable</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>Not applicable</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>Not applicable</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>Not applicable</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>Not applicable</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>Not applicable</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>No alternative routes were considered, as the chosen route was the only route available to service the customer&apos;s home, that met design specific to the needs of the customer requesting gas. Variance Explanation: The Customer Contribution is determined based on a Construction Estimate. During execution, the crew was able to complete the work quicker than anticipated which resulted in the actuals being lower than the estimate.</Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Enbridge Gas Inc.</Historical_Company_Name>
<Year>2024</Year>
<Project_1_Project_Name>30 Lightbeam Terrace - Main ex - MWO#41227988</Project_1_Project_Name>
<Project_1_Location>30 Lightbeam Terrace</Project_1_Location>
<Proj1_Date_Completed>7/30/2024</Proj1_Date_Completed>
<Project_1_Significant_Features>None</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>N/A</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>None</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>N/A</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>N/A</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>N/A</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>N/A</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>71608</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>50904</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>20704</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>41</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Additional unanticipated Hydro Vac costs</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>N/A</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>N/A</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Union Gas Limited</Historical_Company_Name>
<Year>2015</Year>
<Project_1_Project_Name>Kilbride St. Extension Pipeline Project</Project_1_Project_Name>
<Project_1_Location>Hamilton District</Project_1_Location>
<Proj1_Date_Completed>4/30/2015</Proj1_Date_Completed>
<Project_1_Significant_Features>Conservation regulated area. Working in the vicinity of a watercourse. </Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Install sediment fencing. Install using directional drill.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Possible sediment release within watercourse.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>None</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Area monitored during construction to ensure sediment control effective. No sediment release in watercourse.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>Permit obtained from Conservation Halton. Permit obtained from the Niagara Escarpment Commission.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>Incorporated in project costs</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>2</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>1</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>2</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>1</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>N/A</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>N/A</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>N/A</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>N/A</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>N/A</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>N/A</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>N/A</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Union Gas Limited</Historical_Company_Name>
<Year>2016</Year>
<Project_1_Project_Name>Fourth Line Halton Hills</Project_1_Project_Name>
<Project_1_Location>Hamilton District</Project_1_Location>
<Proj1_Date_Completed>11/30/2016</Proj1_Date_Completed>
<Project_1_Significant_Features>Pipeline installation within a Conservation Authority regulated area.</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Installation of sediment fencing. Install the pipeline using the horizontal directional drill method. Less disturbance to the surrounding environment.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Possible sediment release into watercourse.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>None.</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Conditions monitored during construction. Maintain sediment control. No sediment release.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None.</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>Permit obtained from the Credit Valley Conservation Authority.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>N/A</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>2</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>1</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>2</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>1</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>NA</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>NA</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>NA</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>NA</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>NA</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>NA</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>NA</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>NA</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Union Gas Limited</Historical_Company_Name>
<Year>2017</Year>
<Project_1_Project_Name>Curluke Rd. Pipeline Replacement</Project_1_Project_Name>
<Project_1_Location>Chatham District</Project_1_Location>
<Proj1_Date_Completed>7/1/2017</Proj1_Date_Completed>
<Project_1_Significant_Features>1 Watercourse Crossing</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Installation of sediment fencing. Follow Union Gas/DFO endorsed Generic Sediment Control Plan - Dam and Pump Crossing as well as the Stream Crossing Review and Grand River Conservation Authority Permit.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Possible sediment release into watercourse.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>None</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Conditions monitored during construction. Maintain sediment control. No sediment release.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>Grand River Conservation Authority permit in conjunction with the Union Gas Stream Crossing Review.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>NA</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>0</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>3</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>1</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>2</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>NA</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>NA</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>NA</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>NA</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>NA</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>NA</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>NA</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>NA</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>Enbridge Gas Inc.</Current_Company_Name>
<Historical_Company_Name>Union Gas Limited</Historical_Company_Name>
<Year>2018</Year>
<Project_1_Project_Name>Hazelwood Dr. / Gorevale Rd. Pipeline Installation</Project_1_Project_Name>
<Project_1_Location>Thunder Bay District</Project_1_Location>
<Proj1_Date_Completed>9/15/2018</Proj1_Date_Completed>
<Project_1_Significant_Features>4 Watercourse Crossings</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>Installation of sediment controls and the implementation of conditions as outlined in the Stream Crossing Review Lakehead Region Conservation Authority Permit.</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>Possible sediment release into watercourse.</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>None.</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>Conditions monitored during construction. Maintain sediment control. No sediment release during construction.</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None.</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>Lakehead Region Conservation Authority permit in conjunction with the Union Gas Stream Crossing Review.</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>NA</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>0</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>2</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>1</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>2</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>NA</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>NA</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>NA</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>NA</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>NA</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>No</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>NA</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>NA</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>NA</Project_1_Most_Impact_Alternative_1_Financial_Costs>
<Project_1_Comments>Environmental Planning Mitigation Actual Costs are incorporated in project costs.</Project_1_Comments>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>EPCOR Natural Gas Limited Partnership</Current_Company_Name>
<Historical_Company_Name>EPCOR Natural Gas Limited Partnership</Historical_Company_Name>
<Year>2019</Year>
<Project_1_Project_Name>none</Project_1_Project_Name>
<Project_1_Location>none</Project_1_Location>
<Proj1_Date_Completed>5/31/2020</Proj1_Date_Completed>
<Project_1_Significant_Features>none</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>none</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>none</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>none</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>none</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>none</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>none</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>0</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>0</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>none</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>none</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>0</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>0</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>none</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>0</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>0</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>none</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>Yes</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>none</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>none</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>0</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>EPCOR Natural Gas Limited Partnership</Current_Company_Name>
<Historical_Company_Name>EPCOR Natural Gas Limited Partnership</Historical_Company_Name>
<Year>2020</Year>
<Project_1_Project_Name>none</Project_1_Project_Name>
<Project_1_Location>none</Project_1_Location>
<Proj1_Date_Completed>12/31/2020</Proj1_Date_Completed>
<Project_1_Significant_Features>none</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>none</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>none</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>none</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>none</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>none</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>none</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>none</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>none</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>none</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>none</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>none</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>none</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>none</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>none</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>none</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>none</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>Yes</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>none</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>none</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>none</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>EPCOR Natural Gas Limited Partnership</Current_Company_Name>
<Historical_Company_Name>EPCOR Natural Gas Limited Partnership</Historical_Company_Name>
<Year>2021</Year>
<Project_1_Project_Name>none</Project_1_Project_Name>
<Project_1_Location>none</Project_1_Location>
<Proj1_Date_Completed>1/1/2021</Proj1_Date_Completed>
<Project_1_Significant_Features>0</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>0</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>0</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>0</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>0</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>0</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>0</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>0</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>0</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>0</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>0</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>0</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>0</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>0</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>0</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>0</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>0</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>Yes</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>0</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>0</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>0</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>EPCOR Natural Gas Limited Partnership</Current_Company_Name>
<Historical_Company_Name>EPCOR Natural Gas Limited Partnership</Historical_Company_Name>
<Year>2022</Year>
<Project_1_Project_Name>None</Project_1_Project_Name>
<Project_1_Location>None</Project_1_Location>
<Proj1_Date_Completed>1/1/2022</Proj1_Date_Completed>
<Project_1_Significant_Features>0</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>0</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>0</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>0</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>0</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>0</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>0</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>0</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>0</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>0</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>0</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>0</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>0</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>0</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>0</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>0</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>0</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>Yes</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>0</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>0</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>0</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>EPCOR Natural Gas Limited Partnership</Current_Company_Name>
<Historical_Company_Name>EPCOR Natural Gas Limited Partnership</Historical_Company_Name>
<Year>2023</Year>
<Project_1_Project_Name>None</Project_1_Project_Name>
<Project_1_Location>None</Project_1_Location>
<Proj1_Date_Completed>12/31/2023</Proj1_Date_Completed>
<Project_1_Significant_Features>none</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>none</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>none</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>none</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>none</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>none</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>none</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>0</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>0</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>none</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>none</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>0</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>0</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>none</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>0</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>0</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>none</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>Yes</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>none</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>none</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>0</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
<Current_Company_Name>EPCOR Natural Gas Limited Partnership</Current_Company_Name>
<Historical_Company_Name>EPCOR Natural Gas Limited Partnership</Historical_Company_Name>
<Year>2024</Year>
<Project_1_Project_Name>None</Project_1_Project_Name>
<Project_1_Location>None</Project_1_Location>
<Proj1_Date_Completed>4/30/2025</Proj1_Date_Completed>
<Project_1_Significant_Features>None</Project_1_Significant_Features>
<Project_1_Proposed_Mitigation>None</Project_1_Proposed_Mitigation>
<Project_1_Concerns_Raised>None</Project_1_Concerns_Raised>
<Project_1_Reasons_For_Outstanding_Concerns>None</Project_1_Reasons_For_Outstanding_Concerns>
<Project_1_How_Concerns_were_Addressed>None</Project_1_How_Concerns_were_Addressed>
<Project_1_Post_Construction_Issues>None</Project_1_Post_Construction_Issues>
<Project_1_Evidence_Obtained_Approvals>None</Project_1_Evidence_Obtained_Approvals>
<Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>0</Project_1_Environmental_Planning_Mitigation_Actual_Costs_in_Doll>
<Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>0</Project_1_Environmental_Planning_Mitigation_Forecast_Cost_in_Dol>
<Project_1_Environmental_Planning_Mitigation_Variance>0</Project_1_Environmental_Planning_Mitigation_Variance>
<Project_1_Environmental_Planning_Mitigation_Percent_Variance>0</Project_1_Environmental_Planning_Mitigation_Percent_Variance>
<Project_1_Environmental_Planning_Mitigation_Variance_Explanation>0</Project_1_Environmental_Planning_Mitigation_Variance_Explanation>
<Project_1_Least_Impact_Alternative_1_Customer_Attachments>None</Project_1_Least_Impact_Alternative_1_Customer_Attachments>
<Project_1_Least_Impact_Alternative_1_Environmental_Features>None</Project_1_Least_Impact_Alternative_1_Environmental_Features>
<Project_1_Least_Impact_Social_Features>None</Project_1_Least_Impact_Social_Features>
<Project_1_Least_Impact_Alternative_1_Financial_Costs>None</Project_1_Least_Impact_Alternative_1_Financial_Costs>
<Project_1_Considered_Alternate_Routes>Yes</Project_1_Considered_Alternate_Routes>
<Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>None</Project_1_Moderate_Impact_Alternative_2_Customer_Attachments>
<Project_1_Moderate_Impact_Alternative_1_Environmental_Features>None</Project_1_Moderate_Impact_Alternative_1_Environmental_Features>
<Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>None</Project_1_Moderate_Impact_Alternative_1_Financial_Costs_in_Dolla>
<Project_1_Most_Impact_Alternative_3_Customer_Attachments>None</Project_1_Most_Impact_Alternative_3_Customer_Attachments>
<Project_1_Moderate_Impact_Social_Features>None</Project_1_Moderate_Impact_Social_Features>
<Project_1_Environment_Checklist_Completed>Yes</Project_1_Environment_Checklist_Completed>
<Project_1_Most_Impact_Alternative_1_Environmental_Features>None</Project_1_Most_Impact_Alternative_1_Environmental_Features>
<Project_1_Most_Impact_Alternative_1_Social_Features>None</Project_1_Most_Impact_Alternative_1_Social_Features>
<Project_1_Most_Impact_Alternative_1_Financial_Costs>None</Project_1_Most_Impact_Alternative_1_Financial_Costs>
</_x0032_113_x0020_environmental_x0020_monitoring_x0020_1>
</dataroot>